Transportation Research Record Journal of the Transportation Research Board · 1995 · 208 citations · 2 references
EngineeringCivil EngineeringTransportation PlanningStochastic ModelingTransportationTransportation EngineeringTraffic EngineeringTraffic Flow AnalysisTraffic Flow ManagementTraffic Flow TheoryTraffic OperationsTraffic SafetyFreeway Traffic ManagementFreeway Traffic OperationsTraffic Accident AnalysisTraffic BreakdownTraffic Operations PlanningTraffic Stream Modeling
Field data from NCHRP Project 3‑37 show that breakdown at ramp merge junctions can occur at flows below capacity and is not guaranteed even at identical ramp and freeway flows. The study examined a probabilistic model to describe breakdown at ramp‑freeway junctions. The model predicts breakdown probability based on ramp‑vehicle cluster occurrence and was validated through simulation to determine data requirements. Breakdown is probabilistic, driven by ramp‑vehicle cluster occurrence, and available data were insufficient for precise model validation.
Observation of field data collected as part of NCHRP Project 3-37 showed that at ramp merge junctions, breakdown may occur at flows lower than the maximum observed, or capacity, flows. Furthermore, it was observed that at the same site and for the same ramp and freeway flows, breakdown may or may not occur. After visual examination of traffic operations at sites where breakdown occurred, it was observed that immediately before breakdown, large ramp-vehicle clusters entered the freeway stream and disrupted traffic operations. It was concluded that breakdown is a probabilistic rather than deterministic event and is a function of ramp-vehicle cluster occurrence. Subsequently, a probabilistic model for describing the process of breakdown at ramp-freeway junctions was examined. The model gives the probability that breakdown will occur at given ramp and freeway flows and is based on ramp-vehicle cluster occurrence. Simulation of a data collection effort was conducted to establish the data requirements for model validation. It was concluded that the amount of data available was not adequate for precise validation of the probabilistic model.
2